PMM
PIONEERMIN FPO [PMM]
Basic Materials · ASX Small Cap
$0.1050 -12.5%
Updated 22 Jul 2026 · Signals refresh every scan
Get alerts when PMM triggers a new signal
Free watchlist with daily scans for 2,200+ ASX stocks
Active Signals
Bullish Signals
- RSI is looking oversold — historically a spot where stocks tend to bounce
- Sitting right at the lower Bollinger Band — oversold and potentially ready to snap back
- Volume surging at 2.8x normal while price falls — heavy selling pressure
- Took a hit — down 12.5% over the last 5 days
- Lagging the Small Ords index — relative strength of 0.88, underperforming its peers
- Critical cash runway (0.3 quarters)
- Pre-revenue with limited cash
- Near 52-week low (3% of range)
- Micro-cap ($5-20M) - high risk
- CANSLIM S: Tight float (34%)
- Sentiment is mixed — no strong consensus either way
- Pre-revenue company — Altman Z-Score not applicable
- Liquidity risk: 7 zero-volume days in last 20
- RBA hiking (-3pts)
- Calendar: Quarterly 4C in 7d (+5pts)
Risk Signals
- MACD crossed bearish — momentum is fading
- Trading below both moving averages — the trend is working against this one
- Below the 200-day average — the long-term trend is still working against it
- Piotroski F-Score weak (3/9, low-confidence approx)
- Not enough chatter to gauge sentiment — defaulting to neutral
- The bigger volume days are the down days — volume-weighted momentum is negative (-1.99%/day)
Ask Scout AI about PMM
3 free messages/day · Unlimited with Pro
Recent Catalysts
NONE Completes Airborne VTEM Survey at Springfield Project
NONE Completes Heritage Survey and Commences Airborne VTEM Survey
NONE Secures Permission to Drill Springfield Tungsten Project
Recent ASX Announcements
| 2026-07-06 | Completes Airborne VTEM Survey at Springfield Project PRICE SENSITIVE |
| 2026-06-30 | Completes Heritage Survey and Commences Airborne VTEM Survey PRICE SENSITIVE |
| 2026-06-21 | Secures Permission to Drill Springfield Tungsten Project PRICE SENSITIVE |
| 2026-06-02 | Completes Springfield Access Road Reopening PRICE SENSITIVE |
| 2026-05-24 | Springfield Mine Access Works to Accelerate North Pine PRICE SENSITIVE |
Key Metrics
$7.3M
Market Cap
170K
Avg Volume
2.8x
Vol Ratio
$0.10 — $0.27
52-Week Range
N/A
Short Interest
N/A
Cash Runway
-52.3%
ROE
N/A
Profit Margin
CANSLIM Analysis
| Factor | Rating | Detail | |
|---|---|---|---|
| C | Current EPS | fail | EPS Growth: 0% |
| A | Annual Earnings | insufficient_data | CAGR: 0% |
| N | New Highs / Catalysts | neutral | |
| S | Supply & Demand | pass | Float: 34% |
| L | Leader vs Laggard | laggard | RS: -22 |
| I | Institutional Sponsorship | insufficient_data | Inst: 0% |
| M | Market Direction | neutral | Neutral |
Sector: Basic Materials
506 tickers in this sector
View all Basic Materials signals →Browse all ASX tickers A–Z →Track PMM and 2,200+ ASX stocks
Get free access to Scout's AI-powered dashboard with daily scans, watchlist alerts, and exit management for every ASX small cap.
No credit card required